Back to Case Studies
Case Study
CMH GROUP
The CMH GROUP Project was installed in 2020 in Hatfield, Pretoria. The installation took 1 week to complete.
16.2 kWp
System Size
25.78 MWh
Annual Yield
Commercial Grid-Tied
Installation Type
1591.5
Annual kWh/kWp
CMH GROUP

Solution Overview
Grid-Tied Solar PV.
Installation Date2020
LocationHatfield Pretoria
Installation Duration1 weeks
Client GoalTo reduce carbon emissions and reduce reliance on Eskom's grid.
Project Info
System Size16.2 kWp
Inverters Used3 x 5 kW Solis Single Phase
Annual Yield25.78 MWh
Installation TypeCommercial Grid-Tied
Annual kWh \ kWp1591.5