Back to Case Studies
Case Study
Dynachem
The Dynachem Project was installed in 2020 in Roodepoort, JHB. The installation took 1 week to complete.
18.2 kWp
System Size
30 MWh
Annual Yield
Commercial Grid-Tied
Installation Type
1644.4
Annual kWh/kWp

Dynachem

Solution Overview
Grid-Tied Solar PV.
Installation Date2020
LocationRoodepoort
Installation Duration1 week
Client GoalTo reduce energy consumption.
Project Info
System Size18.2 kWp
Inverters Used15 kW Solis
Annual Yield30 MWh
Installation TypeCommercial Grid-Tied
Annual kWh \ kWp1644.4

“Partnering with Daisy allowed us to consolidate our technology stack and focus on what we do best. The transition was seamless and the ongoing support is exceptional.”
- Operations Manager, Dynachem
Want similar results for your business?
Our specialists are ready to audit your current technology stack and design a solution that works for you.