Back to Case Studies
Case Study
Eez Wel Engineering
The Eez Wel Engineering Project was installed in 2020 in Randburg. The installation took 2 days to complete.
1 x 200 kVA Perkins Generator set
System Size
2 Days
Installation Duration
Eez Wel Engineering

Solution Overview
Installation Date2020
LocationRandburg
Installation Duration2 Days
Client GoalBack up Power
Project Info
System Size1 x 200 kVA Perkins Generator set

“Partnering with Daisy allowed us to consolidate our technology stack and focus on what we do best. The transition was seamless and the ongoing support is exceptional.”
- Operations Manager, Eez Wel Engineering
Want similar results for your business?
Our specialists are ready to audit your current technology stack and design a solution that works for you.