Back to Case Studies
Case Study
Rugani Carrots 2MW Generator Synchronized Project
The Rugani Carrots 2MW Genset Project was installed in 2020 in Tarlton. The installation took 5 weeks to complete.
4x 500 kVA Volvo Generator Set
System Size
2MW Synchronized Back up Generator System (Custom Built with super silent canopies)
Installation Type
5 Weeks
Installation Duration

Rugani Carrots 2MW Genset

Solution Overview
Rugani Carrots 2MW Generator Synchronized Project
Installation Date2020
LocationTarlton
Installation Duration5 Weeks
Client GoalThe client needed back up power, as they would lose a large amount of revenue during down time due to power outages.
Project Info
System Size4x 500 kVA Volvo Generator Set
Installation Type2MW Synchronized Back up Generator System (Custom Built with super silent canopies)

Other Specs:
- 20000l Automated refueling System
- Deepsea Control System with Webnet Interface
“Partnering with Daisy allowed us to consolidate our technology stack and focus on what we do best. The transition was seamless and the ongoing support is exceptional.”
- Operations Manager, Rugani Carrots 2MW Generator Synchronized Project
Want similar results for your business?
Our specialists are ready to audit your current technology stack and design a solution that works for you.