Eureka DIY

Solution Overview

Installation Date

2017

Location

Roodepoort

Installation Duration

8 weeks

Client Goal

Reduce reliance on national grid

Project Info

System Size

Phase 1 – 136.7 kWp; Phase 2 – 327 kWp; Phase 3 – 220 kWp

Inverters Used

Huawei

Annual Yield

1606.9

Installation Type

Commercial Grid-Tied

Annual kWh \ kWp

1606.9

Aluminium casting is an extremely intricate process that relies on a stable power supply. When the power failures occur, the batch becomes un-useable, the pots run the risk of cracking and have to be cleaned out requiring heavy labour. The generator alleviated all the downtime as well as replacement costs.